四个大项目,把 AgentScope 交付成产品Four capstones that turn AgentScope into products
从客服 Copilot 到可恢复的运维指挥,每个项目都有明确的专注时长、完成窗口、里程碑、交付物与评分表。开始计时后,专注时钟与截止倒计时会一直跟着你;勾完所有验收项并写完复盘,才能结算 XP。From a support copilot to a resumable ops commander, every project ships with a focus budget, a delivery window, milestones, deliverables and a rubric. Start the clock and the focus timer plus deadline countdown follow you; XP lands only after every check and the delivery reflection.
四个项目The four projects
每张卡都标明专注预算与完成窗口。项目按交付物评估:选择适合团队的轨道,再按对应实现说明推进。Each card shows its focus budget and delivery window. Projects are language-agnostic deliverables: pick the track that fits the team, then follow the matching build notes.
客服 CopilotSupport Copilot
带审批闸门的工单分诊 AgentTicket triage with an approval gate
研究分析师Research Analyst
带证据链的竞品尽调 AgentCompetitive research with an evidence chain
修复流水线Repair Pipeline
可回滚的沙箱修复 AgentA rollback-safe repair agent
运维指挥Ops Commander
可恢复的事故 CopilotA resumable incident copilot
限时规则How the timebox works
开启窗口Start the window
开始会写下截止时间并启动专注时钟。时钟按真实时间走:刷新或关掉标签页不会停,除非你暂停。Start sets a deadline and begins the focus clock. The clock is wall time: reloading or closing the tab does not stop it until you pause.
暂停与继续Pause and resume
离开就暂停。计时只在运行中累加;可以随时暂停多次。Pause when you leave. The timer accumulates only while running; you can pause as often as you like.
证据优先Evidence over ticks
里程碑只有在验收成立时才勾,交付物只有文件存在且可重跑时才勾。勾选是你愿意被追问的声明。Check a milestone only when its acceptance holds, and a deliverable only when the file exists and reruns. Ticks are claims you can defend.
完成门槛Finish gate
完成需要全部勾选并写满 20 字复盘。XP 只发一次;项目徽章与 XP 同时解锁。Finish requires every checkbox plus a 20-character reflection. XP is paid once; the project badge unlocks on the same gate.
超时也是数据Late is data
超过窗口仍可完成,但记录会标记为延期并显示截止状态。不要掩饰,把延误写进复盘。Missing the window still lets you finish, but the record is marked late and the deadline is called out. Do not hide it; write what slipped.
完成前可重置Reset before finish
未完成项目可两次点击重置,清空计时、清单与复盘;已完成交付记录会保留。An unfinished project can be reset (two clicks) to clear the timer, checklist and reflection. Finished delivery records are kept.
时间预算Time budgets
预算按在职工程师校准:6 到 20 个专注小时。窗口是日历上限,不是预期工时。Budgets are calibrated for a working engineer: 6 to 20 focused hours. A window is the calendar limit, not the expected effort.
| 项目Project | 难度Level | 专注Focus | 窗口Window | 里程碑Milestones | 交付物Deliverables | XP |
|---|---|---|---|---|---|---|
| P1 客服 CopilotSupport Copilot | 进阶Advanced | 6h | 7 天7 days | 5 | 5 | 250 |
| P2 研究分析师Research Analyst | 进阶Advanced | 10h | 14 天14 days | 5 | 5 | 350 |
| P3 修复流水线Repair Pipeline | 高级Advanced | 14h | 14 天14 days | 5 | 6 | 450 |
| P4 运维指挥Ops Commander | 专家Expert | 20h | 21 天21 days | 5 | 6 | 600 |
| 合计Total | 50h | 22 | 1650 |
项目共用同一实验工作区。所有产物写到 lab/work/projects/<id>/,确保可复现,绝不触碰生产仓库。Projects reuse the same lab workspace. Write everything under lab/work/projects/<id>/ so runs are reproducible and never touch a production repository.